Projects - Phase II
Shopping Center-Hazardous Materials back Client: Consolidated Consulting/Sub to URS Project: CC Chandler Plaza--Chandler, Arizona. Solution: An environmental assessment was conducted with findings of several former tenants who had handled hazardous materials on the property. The assessment included sampling for suspected asbestos-containing-materials, mold, radon and lead in water. PCB bearing equipment survey was also conducted. BEAR provided corrective measures for the observed environmental issues to complete the property transaction. A Phase II Site Assessment of the former tenants found impacted soils from various chemicals. The impacted soils were below the Soil Remediation Levels (SRL) for a residential site, and no further work was required. |
||